Picture found of an earlier bathroom remodel that was done. Only uploaded the shower pic previously. This shows the tub, walls, floor and vanity.
Thursday, December 27, 2018
Wednesday, December 19, 2018
Tuesday, December 11, 2018
Wednesday, November 21, 2018
Bathroom Remodel
Complete bathroom tearout. Over sink soffit removed. New tub and plumbing installed, floor, baseboards and tub surround tiled with nook. Bath fan installed with separate switch. Electrical outlet added and two gfci installed. Light moved from ceiling to wall with new fixtures. New toilet, vanity cabinets, quartz countertop and faucets. Room painted.
Closet installation
Closet organizer installation. We installed hanging units, shelving, clothes hanging rods and drawers.
Monday, November 5, 2018
Sunday, October 28, 2018
Thursday, October 25, 2018
Cement Driveway Pour
The old driveway and sidewalk to porch was ripped up and extended 5 inches on the right side and extended 10 feet on the left. The cement is 6 bag mix fiber mesh. A paver ribbon and raised sidewalk was added.
Wednesday, October 24, 2018
Monday, October 15, 2018
Tuesday, October 9, 2018
Monday, October 8, 2018
Saturday, October 6, 2018
Sunday, September 23, 2018
Saturday, September 22, 2018
Friday, September 21, 2018
Chimney Build
Chimney tore down about 10 coarses. reused good bricks and installed new for the top. Installed cap with wash.
Thursday, September 20, 2018
Garage Build
garage build. New footing slab and driveway, electrical, doors, siding and roof. Brick facing installed on each side of door.
Saturday, September 8, 2018