Thursday, December 27, 2018

Bathroom Remodel

Picture found of an earlier bathroom remodel that was done. Only uploaded the shower pic previously. This shows the tub, walls, floor and vanity.

Wednesday, December 19, 2018

Fireplace Remodel

Old tile hearth and surround removed. We then installed a new tile hearth and stone surround

Tuesday, December 11, 2018

Backsplash Installation

Kitchen back splash installation of white subway tiles with grey grout.


Wednesday, November 21, 2018

Bathroom Remodel

Complete bathroom tearout. Over sink soffit removed. New tub and plumbing installed, floor, baseboards and tub surround tiled with nook. Bath fan installed with separate switch. Electrical outlet added and two gfci installed. Light moved from ceiling to wall with new fixtures. New toilet, vanity cabinets, quartz countertop and faucets. Room painted.





Closet installation

Closet organizer installation. We installed hanging units, shelving, clothes hanging rods and drawers.




Monday, November 5, 2018

Thursday, October 25, 2018

Paver Installation

We installed a paver driveway ribbon and raised sidewalk step with driveway cement project.



Cement Driveway Pour

The old driveway and sidewalk to porch was ripped up and extended 5 inches on the right side and extended 10 feet on the left. The cement is 6 bag mix fiber mesh. A paver ribbon and raised sidewalk was added.





Monday, October 15, 2018

Tuesday, October 9, 2018

Monday, October 8, 2018

Fence and Step Install

old iron railing removed and new wood rail and steps installed with aluminum spindles and gate.


Sunday, September 23, 2018

Saturday, September 22, 2018

Stair Railing Project

Old railing removed and new square posts and square top rail installed with horizontal spindles.




Friday, September 21, 2018

Chimney Build

Chimney tore down about 10 coarses. reused good bricks and installed new for the top. Installed cap with wash.

Thursday, September 20, 2018

Garage Build

garage build. New footing slab and driveway, electrical, doors, siding and roof. Brick facing installed on each side of door.