Monday, October 31, 2016

Bathroom Wall Tile Project



Sunday, October 30, 2016

Cown Molding Installation

Installed 5 1/4 inch crown molding and medallion in dining room, foyer, hallway and kitchen.




Saturday, October 29, 2016

Kitchen Remodel

back splash installed in kitchen remodel.


Friday, October 28, 2016

Floor Install

Kitchen floor installation. Ceramic wood look 8 x 24 inch tiles used.





Sunday, October 9, 2016

Den Remodel

We converted the front den to a bedroom by adding a wall and door. We then built a closet with side shelving and french doors.