Sunday, May 29, 2016

Cedar Gazebo Build

Gazebo was built out of cedar with a metal roof.


Saturday, May 28, 2016

Paver and Step Installation

Paver sidewalk, driveway ribbons and limestone step install.



Friday, May 27, 2016

Interior house Paint

Interior walls skim coated. Ceiling, walls and trim were primed and painted.







Sunday, May 22, 2016

Bathroom Remodel

Bathroom remodel completed. Shower install, slate tile and floor installed, toilet, shower door, vanity, mirror installed. The bathroom was then painted.


Exterior Paint

The exterior of home was powerwashed and painted with 2 coats of paint.







Saturday, May 14, 2016

Exterior House Paint

Exterior of home was painted and power washed. Along with garage door and entry doors




Wednesday, May 11, 2016

Wednesday, May 4, 2016

Exterior Shed Paint

Shed was power washed, scraped and painted. We also installed a small pond with fountain and waterfall.