Wednesday, March 23, 2016

Porch Reface

We removed the step and brick facing from the porch and installed new brick and reinstalled the step.

Tuesday, March 22, 2016

Chimney Rebuild

We tore down 14 coarses and rebuilt the top of the chimney and also installed a limestone cap.

Monday, March 21, 2016

Chimney Rebuild

We tore down and rebuilt the top 10 coarses of the chimney. We also installed a new flue and a concrete cap.

Commercial Block Project and demo

We extended the front of the building up 12 coarses of block to match the existing building. We also demoed out all the roof trusses and roofing material.




Thursday, March 10, 2016

Handcap Bathroom Remodel

Complete bathroom remodel. Tub, tile and floor removed. New diverter installed, new drain and plumbing, shower pan installed, shower surround has been red gaureded, new tile installed, toilet, sink and vanity installed. Handicap grab bars will be installed later.




Wednesday, March 9, 2016

Complete Bathroom Remodel

Complete bathroom remodel. We tore bathroom down to studs and installed new tiled shower, walls,floor and custom mirror frame. We installed drywall, new plumbing, electrical, vanity, faucet, sink and toilet. We finished with paint and some decorative shelves.


Tuesday, March 8, 2016

Slate Tile Bathroom Remodel

Shower build with slate tile, bench seat and nook. Before gout pics and after grout pics.