Living room and hallway floor refinish. The carpet and padding were removed and disposed of. The tack strips and staples were removed. All the holes were filled. The floor was then sanded and three coats of poly were applied for a natural finish.
Thursday, November 26, 2015
Sunday, November 15, 2015
Tile Floor Installation
Old laminate,linoleum and subfloor removed. Cement board installed and 24 x 12 tiles were laid on a third pattern.
Monday, November 9, 2015
Sunday, November 8, 2015
Kitchen Remodel Completed
Complete kitchen remodel. The kitchen was completely gutted, floor, cabinets, soffits, plumbing removed. We drywalled the removed soffits and reran electrical lines that were running through soffits. We installed marble flooring in the kitchen, stairs and landing. Four electrical outlets were added. New tall cabinets were installed with crown molding. New counters installed. New sink and faucet installed. We removed one sink drain from the old double and went down to one drain. New lighting installed and backsplash. The room was primed and painted. New baseboards and shoe molding installed. Dishwasher was installed.
Saturday, November 7, 2015
Friday, November 6, 2015
Thursday, November 5, 2015
Monday, November 2, 2015
Sunday, November 1, 2015
Concrete Counters Installed
Custom concrete counters installed to finish a kitchen remodel. A farm sink and new faucet was also installed.