Thursday, November 26, 2015

Hardwood Floor Refinish

Living room and hallway floor refinish. The carpet and padding were removed and disposed of. The tack strips and staples were removed. All the holes were filled. The floor was then sanded and three coats of poly were applied for a natural finish.


Sunday, November 15, 2015

Tile Floor Installation

Old laminate,linoleum and subfloor removed. Cement board installed and 24 x 12 tiles were laid on a third pattern.





Monday, November 9, 2015

Porch Handrail Install

Iron stair rail installed on porch steps.

Sunday, November 8, 2015

Kitchen Remodel Completed

Complete kitchen remodel. The kitchen was completely gutted, floor, cabinets, soffits, plumbing removed. We drywalled the removed soffits and reran electrical lines that were running through soffits. We installed marble flooring in the kitchen, stairs and landing. Four electrical outlets were added. New tall cabinets were installed with crown molding. New counters installed. New sink and faucet installed. We removed one sink drain from the old double and went down to one drain. New lighting installed and backsplash. The room was primed and painted. New baseboards and shoe molding installed. Dishwasher was installed.





Saturday, November 7, 2015

Cultered Stone Installation

Cultured Stone was installed along base of the house as well as the piers.











Friday, November 6, 2015

Thursday, November 5, 2015

Monday, November 2, 2015

Hardwood Floor Install

Prefinished Hardwood floor installation in a living room, dining room and kitchen.



Sunday, November 1, 2015

Concrete Counters Installed

Custom concrete counters installed to finish a kitchen remodel. A farm sink and new faucet was also installed.