Stair railing installation with wrought iron balusters. The walls were also painted mocha in a flat enamel.
Saturday, October 31, 2015
Friday, October 30, 2015
Painting Completed on Stair Job
Walls, baseboards, trim and stair risers painted on the previous job of flooring and stair installation.
Thursday, October 22, 2015
Hardwood Floor Steps and Ceramic
The old carpet was removed. New hardwood was installed in the office and hallway. New Stair risers were installed. Oak stair treads were stained, polyed and installed on 3 staircases. Ceramic tile was installed in the foyer.
Wednesday, October 21, 2015
Kitchen Remodel
Complete kitchen remodel with tear out down to studs. New tray ceiling installed. New cabinets, hardwood floor, island, light fixtures, laminate countertops, new sink and faucet, backsplash, chair rail and baseboards and new paint.
Sunday, October 18, 2015
Stone Ledgestone Piers
Ledgestone faced piers on Alex and Ani storefront at 12 oaks mall. slots cut for front window to be installed.
Wednesday, October 14, 2015
Bathroom Remodel
Complete tear out down to studs. Insulation, drywall, new tub, toilet, vanity, new ceramic tile floor and shower surround. Last, new plumbing fixtures, towel bars and new paint.
Friday, October 9, 2015
Floor and Railing Refinish
Hardwood floor was sanded and stained and two coats of satin poly were applied. The railing was sanded, a second bottom board was added to raise railing higher than the hardwood, iron spindles were installed, stain and two coats of poly were applied and quarter round trim added.
Thursday, October 8, 2015
Saturday, October 3, 2015
Friday, October 2, 2015
Thursday, October 1, 2015