Before and after pics of limestone address install.
Tuesday, July 28, 2015
Sunday, July 26, 2015
Upper Peninsula Cabin Build
Small one room cabin with loft build. Footing poured, logs installed, small kitchen and bath installed, wood stove installed and metal roofing installed.
Tuesday, July 21, 2015
Sunday, July 19, 2015
Saturday, July 11, 2015
Friday, July 10, 2015
Bar Patio Expansion
We removed existing sidewalk and relocated bushes. Poured a concrete pad and new sidewalk as well as extending the canopy.
Thursday, July 9, 2015
Wednesday, July 8, 2015
Wall removal
Two walls were removed to open up the entry and kitchen area. One between the kitchen and family room and one between family room and foyer. New headers installed, drywall, prime, paint and trim.
Tuesday, July 7, 2015
Pantry Build
Pantry built in kitchen doorway. We used an existing pocket door between a kitchen and family room area to build a kitchen pantry. We framed out the walls and drywalled. We then built shelving inside. The original pocket door is used as the pantry door.
Monday, July 6, 2015
Saturday, July 4, 2015
Porch Build
New porch build. Footings dug and poured, brick installed, porch filled, we then poured the cap and sidewalk. Lastly a limestone door sill lug, and brick riser and rock face limestone steps were installed.
Friday, July 3, 2015
Fireplace Reface
River rock cultured stone used to reface the fireplace and hearth we installed a pine mantle and slate top on the hearth.
Thursday, July 2, 2015
Fireplace Stone Build
Stacked stone interior and exterior fireplace with limestone mantle, limestone chimney cap and cultured stone facing job completed.
Wednesday, July 1, 2015