Wednesday, May 20, 2015

Limestone Steps

Old brick steps and pad were removed. New matching brick risers and splitface limestone treads were installed along with new concrete pad and paver walk repair.

Friday, May 15, 2015

Porch Build With Limestone Steps

Porch build with limestone steps.

Sunday, May 10, 2015

New Driveway and Limestone Step Job.

New cement driveway and sidewalk with a split face limestone step with brick riser.





Commercial Building Paint

Commercial block building primed with luxon primer and Sherwin williams superpaint.


Thursday, May 7, 2015

Brick Porch and Sidewalk

Porch top, step and sidewalk build with clay brick pavers. The porch and step were built with red common brick to match the existing home. A cement porch cap was poured with wire. We then used a cement/mortar mix to set the brick and grout the joints.


Monday, May 4, 2015

Garage build

Step 1 for garage build. 42" footings dug, foundation poured, 2 coarses block under grade 2 above grade, anchor bolts installed, openings for front and rear garage doors and a 36" Side door.