Master Bath Remodel
Complete tearout down to studs. We installed new cabinets, countertops, sink and fixtures. We also installed new lighting, outlets and drywall. We tiled the floor, shower and tub surround and installed a new toilet and whirlpool tub.
Monday, December 14, 2015
Powder Room Remodel
The old powder room was demoed. We installed a new subfloor, cement board, tile, a new vanity, counter and faucet, toilet and put on two coats of paint.
Tuesday, December 8, 2015
Bar Backsplash
We finished the stone installation for the wet bar backsplash. The wet bar features new cabinets, countertops, a stainless trough sink and recycled pallet wood facing.
Monday, December 7, 2015
Garage Addition Project
Progress of our funeral home garage addition. We now have the concrete pad poured. Framing and sheathing also installed.
Thursday, November 26, 2015
Hardwood Floor Refinish
Living room and hallway floor refinish. The carpet and padding were removed and disposed of. The tack strips and staples were removed. All the holes were filled. The floor was then sanded and three coats of poly were applied for a natural finish.
Sunday, November 15, 2015
Tile Floor Installation
Old laminate,linoleum and subfloor removed. Cement board installed and 24 x 12 tiles were laid on a third pattern.
Monday, November 9, 2015
Sunday, November 8, 2015
Kitchen Remodel Completed
Complete kitchen remodel. The kitchen was completely gutted, floor, cabinets, soffits, plumbing removed. We drywalled the removed soffits and reran electrical lines that were running through soffits. We installed marble flooring in the kitchen, stairs and landing. Four electrical outlets were added. New tall cabinets were installed with crown molding. New counters installed. New sink and faucet installed. We removed one sink drain from the old double and went down to one drain. New lighting installed and backsplash. The room was primed and painted. New baseboards and shoe molding installed. Dishwasher was installed.