Monday, December 28, 2015

Deck Build




Sunday, December 27, 2015

Floor installation

laminate floor installation in kitchen, landing and foyer.


Tuesday, December 22, 2015

Privacy fence Installation


Monday, December 21, 2015

Garage Build and Stone facing

Garage build with cultured stone pier facing to match installation of stone on the house.


Sunday, December 20, 2015

Backsplash install

  1. New drywall was installed then stone backsplash. We also installed the over stove vent hood.




Friday, December 18, 2015

Second Floor Laundry Tile Installation

We installed cement board and tiled this Second floor laundry room

Thursday, December 17, 2015

Master Bath Remodel

Complete tearout down to studs. We installed new cabinets, countertops, sink and fixtures. We also installed new lighting, outlets and drywall. We tiled the floor, shower and tub surround and installed a new toilet and whirlpool tub.



Monday, December 14, 2015

Powder Room Remodel

The old powder room was demoed. We installed a new subfloor, cement board, tile, a new vanity, counter and faucet, toilet and put on two coats of paint.


Tuesday, December 8, 2015

Bar Backsplash

We finished the stone installation for the wet bar backsplash. The wet bar features new cabinets, countertops, a stainless trough sink and recycled pallet wood facing.



Monday, December 7, 2015

Garage Addition Project

Progress of our funeral home garage addition. We now have the concrete pad poured. Framing and sheathing also installed.



Thursday, November 26, 2015

Hardwood Floor Refinish

Living room and hallway floor refinish. The carpet and padding were removed and disposed of. The tack strips and staples were removed. All the holes were filled. The floor was then sanded and three coats of poly were applied for a natural finish.


Sunday, November 15, 2015

Tile Floor Installation

Old laminate,linoleum and subfloor removed. Cement board installed and 24 x 12 tiles were laid on a third pattern.





Monday, November 9, 2015

Sunday, November 8, 2015

Kitchen Remodel Completed

Complete kitchen remodel. The kitchen was completely gutted, floor, cabinets, soffits, plumbing removed. We drywalled the removed soffits and reran electrical lines that were running through soffits. We installed marble flooring in the kitchen, stairs and landing. Four electrical outlets were added. New tall cabinets were installed with crown molding. New counters installed. New sink and faucet installed. We removed one sink drain from the old double and went down to one drain. New lighting installed and backsplash. The room was primed and painted. New baseboards and shoe molding installed. Dishwasher was installed.





Saturday, November 7, 2015

Cultered Stone Installation

Cultured Stone was installed along base of the house as well as the piers.











Friday, November 6, 2015

Thursday, November 5, 2015

Monday, November 2, 2015

Hardwood Floor Install

Prefinished Hardwood floor installation in a living room, dining room and kitchen.