Bathroom tear out and new shower installation and new tile flooring.
Friday, August 29, 2014
Monday, August 25, 2014
Bedroom makeover
Master bedroom makeover with master walk-in closet build. We used corrugated roofing for one wall, added gray paint and black trim with a charcoal color on the closet separating wall with stucco texture. The original closet was bi-folding doors on one wall (you can see the floor seam where the old closet ended). We then built a wall 1 foot short of the ceiling and added a custom cabinet system to both sides of the walk-in closet. We installed led lights on the top backside of the separating wall and mounted a led tv and fireplace.
Monday, August 11, 2014
Stamped Concrete and Brickwork
Circle driveway and sidewalk cement work, two tone stamped concrete patio and stamped concrete walkway and porch. We also built the top level porch with a brick base as well as the brick piers, walls and limestone caps.
Friday, August 8, 2014
Exterior Home Remodel
We installed a new roof, vinyl siding and trim, post light, new porch build including pier build with stone split face limestone steps and composite tapered posts.
Thursday, August 7, 2014
Complete kitchen Remodel
Complete kitchen remodel.
Installed cabinets, counter, sink, new appliances, hand scraped bamboo flooring, lighting, stone slate backsplash, kitchen island and burgandy venetian plaster on the walls as well as a custom handscraped window trim.
Subscribe to:
Posts (Atom)