This is a complete bathroom remodel.
Entire demolition, new tub, tile shower surround with shelves and accents, new tile floor, new drywall, new cabinets and toilet install, glass tile backsplash, new plumbing fixtures, bath fan install.
Saturday, December 27, 2014
Monday, December 8, 2014
Friday, November 14, 2014
Wednesday, November 12, 2014
Bathroom renovation
Complete bathroom tearout. We then installed new cement board installed floor, wall and shower tile. We also installed jacuzzi tub, electrical ,plumbing, new toilet and vanity.
Exterior siding installation and paint
Installation of cedar shake siding, hardiboard siding, trim installation. The cedar shake was then stained, hardiboard painted and trim painted.
Friday, October 10, 2014
Deck Rebuild
Complete deck rebuild with additional deck space added on. New decking, fascia, boards, posts railing and gate.
Monday, September 29, 2014
Thursday, September 11, 2014
kitchen remodel and home interior paint
Kitchen remodel and home paint job. New cabinets, new granite counters, sink and faucet, new vertical glass and stone back splash with kitchen, hallways and great room paint job.
Wednesday, September 3, 2014
Roof job completed
roof tear off and shingles. Ice guard, 30 lb felt, pipe collars, drip edge, vents and new dimensional shingles installed.
Friday, August 29, 2014
Monday, August 25, 2014
Bedroom makeover
Master bedroom makeover with master walk-in closet build. We used corrugated roofing for one wall, added gray paint and black trim with a charcoal color on the closet separating wall with stucco texture. The original closet was bi-folding doors on one wall (you can see the floor seam where the old closet ended). We then built a wall 1 foot short of the ceiling and added a custom cabinet system to both sides of the walk-in closet. We installed led lights on the top backside of the separating wall and mounted a led tv and fireplace.
Monday, August 11, 2014
Stamped Concrete and Brickwork
Circle driveway and sidewalk cement work, two tone stamped concrete patio and stamped concrete walkway and porch. We also built the top level porch with a brick base as well as the brick piers, walls and limestone caps.