Thursday, November 22, 2012

DECK, PAVERS, FLOWER BOX INSTALL

We removed old cement steps and sidewalk, installed new front deck and steps. The porch install was a little difficult as it had to go over a weird cement bump out under the bay window. We installed a paver sidewalk and finally a cedar flower box.

Wednesday, November 21, 2012

CHIMNEY REBUILD

Rebuilt top half of chimney and tuckpointing.

Tuesday, November 20, 2012

CHIMNEY TUCK POINT AND WASH

A customer had the chimney repaired previously and this is how they left it. We removed all the joints, retucked it and applied a wash on the top.

BEFORE
AFTER

Saturday, November 10, 2012

STAIRWAY, FLOOR AND BANISTERS

Custom made staircase, hardwood floor and banisters. Some of the pics came out blurry.