Friday, December 21, 2012

BASEMENT WET BAR

Installation of a basement wet bar. Cabinets, lighting, electrical, plumbing, wine fridge, counter and paint.

Thursday, December 20, 2012

DRYWALL GREAT ROOM and KITCHEN

Drywall of livingroom and dining room and kitchen.

Wednesday, December 19, 2012

MASTER BATH REMODEL

Complete tear out down to studs. New bathroom installation.

Thursday, November 22, 2012

DECK, PAVERS, FLOWER BOX INSTALL

We removed old cement steps and sidewalk, installed new front deck and steps. The porch install was a little difficult as it had to go over a weird cement bump out under the bay window. We installed a paver sidewalk and finally a cedar flower box.

Wednesday, November 21, 2012

Tuesday, November 20, 2012

CHIMNEY TUCK POINT AND WASH

A customer had the chimney repaired previously and this is how they left it. We removed all the joints, retucked it and applied a wash on the top.

BEFORE
AFTER

Saturday, November 10, 2012

STAIRWAY, FLOOR AND BANISTERS

Custom made staircase, hardwood floor and banisters. Some of the pics came out blurry.